Pilning station main line signal box
Pilning station main line signal box

The Main line from Bristol through the Severn Tunnel was brought into use for passenger traffic in December 1886.
The route of the Union line was used from Bristol to Pilning Junction, this section was upgraded for main line use, also a new section of railway was built from Pilning through the Severn Tunnel to South Wales.